# New Mexico solar incentives

Source: Solar Incentive Atlas, https://solarincentiveatlas.com/states/new-mexico/
Checked against primary sources: 19 November 2026

> New Mexico refunds 10% of a home solar system's cost, up to $6,000, through a state tax credit that runs to the end of 2031, and solar installs carry no gross receipts tax.

## At a glance

- Net metering: Full retail net metering. kWh credits bank month to month for systems up to 10 kW
- State tax credit: Yes. 10% of cost, max $6,000, refundable
- Sales tax exemption: Yes. Gross receipts tax deduction
- Property tax exemption: Yes. Solar does not lift valuation cap
- Rebates: No
- Performance payments: No
- SREC market: No
- Battery incentives: No
- Income-qualified programs: Partial. Community solar carve-out; Solar for All paused
- Community solar: Partial. Program rolling out, 30% low-income minimum

## Overview

New Mexico is one of the few states that still pays a state tax credit for home solar now that the federal residential credit has ended. The New Solar Market Development Tax Credit is worth 10% of equipment, materials and labor, capped at $6,000 per system. It is refundable, so any amount above your state tax liability is paid to you, and it can be transferred to another taxpayer. The Energy, Minerals and Natural Resources Department certifies up to $30 million of credits per calendar year, first come, first served, and the credit applies to tax years ending before 1 January 2032.

Two tax rules reduce the cost further. Receipts from the sale and installation of a solar energy system are deductible from gross receipts tax, so installers do not pass that tax on. And a solar installation is excluded from the kinds of home improvement that let a county assessor raise a residential valuation above the annual cap.

Net metering is required of utilities regulated by the Public Regulation Commission. For systems of 10 kW or less, PNM banks net monthly overproduction as kWh credits that do not expire and can be used against later bills, which is equivalent to retail-rate crediting for a system sized to annual use. Credits are only cashed out, at a low avoided-cost rate, if you close the account. Systems over 10 kW are paid monthly at that avoided-cost rate. PNM's solar renewable energy certificate purchase program closed to new customers on 31 December 2022.

New Mexico's $156 million Solar for All grant has been paused since the EPA moved to terminate it on 7 August 2025, and no household application process has opened. The state's community solar program, created by a 2021 law, requires each project to reserve at least 30% of its capacity for low-income subscribers; the Public Regulation Commission still describes the program as under development.

Federal note: the 30% federal Residential Clean Energy Credit (Section 25D) ended for systems installed after 31 December 2025.

## Net metering and export credit

Net metering in New Mexico is governed by Public Regulation Commission rule 17.9.570 NMAC, last replaced on 24 May 2022. It applies to every electric utility under the commission's jurisdiction, including investor-owned utilities and rural electric cooperatives. For systems of 10 kW or less, a utility may either credit or pay for net excess energy at its avoided-cost energy rate, or carry the net kWh forward as a credit from month to month. If the customer leaves the system, unused credits are paid out at the utility's energy rate.

PNM, the largest utility, uses the kWh credit method for its Small PV Program (inverter capacity of 10 kW AC or less). Net overproduction in a month becomes a kWh credit on the next bill. PNM states that the credits never expire, so spring surplus can offset summer air conditioning use. On account closure PNM pays remaining credits at its Rate 12 purchase price, which for residential schedules ranged from roughly zero to about 5.4 cents per kWh by month under the schedule effective 1 March 2026.

Systems above 10 kW and up to 10 MW are handled differently. Net energy delivered to the utility is bought each month at the utility's filed energy rate. Under the rule, a balance owed to the customer of less than $50 carries to the next billing period and a balance of $50 or more must be paid.

- Export credit: For systems up to 10 kW at PNM: one kWh credit per net kWh exported, usable against later bills. Over 10 kW: avoided-cost rate (PNM Rate 12, roughly 0 to 5.4 cents per kWh by month in 2026).
- System size limit: 10 kW AC for kWh banking under the small system rules; a separate metering agreement covers systems over 10 kW up to 10 MW
- Excess credits: kWh credits roll over month to month and, at PNM, do not expire. Cashed out at the avoided-cost energy rate only when the account closes.
- Coverage: All electric utilities under Public Regulation Commission jurisdiction, including PNM, El Paso Electric, Southwestern Public Service (Xcel Energy) and rural electric cooperatives.
- Recent changes: The commission repealed and replaced rule 17.9.570 NMAC effective 24 May 2022. No change to residential net metering in 2024 to 2026 was found.

## Programs

### New Solar Market Development Tax Credit

- Type: State tax credit
- Status: Active
- Scope: statewide
- Value: 10% of system cost, up to $6,000; refundable
- Administrator: Energy, Minerals and Natural Resources Department (EMNRD), with the Taxation and Revenue Department
- End date: 2031-12-31
- Legal basis: NMSA 1978 Section 7-2-18.31 (Laws 2020, ch. 13; 2022, ch. 47; 2024, ch. 67); 3.3.14 NMAC

A state income tax credit of up to 10% of the equipment, materials and labor cost of a solar photovoltaic or solar thermal system, capped at $6,000. Any credit above your tax liability is refunded, and the credit may be sold or transferred to another taxpayer. EMNRD can certify up to $30 million of credits per calendar year, a limit raised from $12 million by the 2024 legislature.

Who qualifies: New Mexico taxpayers who buy and install a system on property they own in the state (or hold in leasehold from a federally recognized tribe, pueblo or nation). The certified cost is the net cost: rebates, discounts and grants are deducted, and standalone battery cost is not an allowable cost for a grid-tied system.

How to claim: After the system passes its building code inspection, apply online through EMNRD's submission portal with proof of ownership (such as a property tax bill), the inspection report, an itemized invoice, a site plan, design schematics and an electrical diagram. Paper applications are not accepted. EMNRD emails a certificate of eligibility in about 3 to 4 weeks, and you claim the amount on your New Mexico income tax return for the year shown on the certificate.

Dates and limits: Apply within 12 months after the calendar year of installation. Applications received after the $30 million annual limit is reached are returned and do not roll into the next year. The fund year is set by the inspection date. EMNRD's credit page does not state how much of the current year's limit remains; the balance is shown on its Solar Market Dashboard, so check it or ask EMNRD before relying on the credit late in the year.

Sources: [EMNRD, Solar Market Development Tax Credit](https://www.emnrd.nm.gov/ecmd/tax-incentives/solar-market-development-tax-credit-smdtc/); [EMNRD, New Solar Market Development Tax Credit User Guide (February 2026)](https://www.emnrd.nm.gov/ecmd/wp-content/uploads/sites/3/NSMDTC-02.2026.pdf); [NMSA 1978 Section 7-2-18.31, 2025 text (Justia)](https://law.justia.com/codes/new-mexico/chapter-7/article-2/section-7-2-18-31/)

### Gross receipts tax deduction for solar energy systems

- Type: Sales tax exemption
- Status: Active
- Scope: statewide
- Value: No gross receipts tax on sale and installation
- Administrator: New Mexico Taxation and Revenue Department
- Legal basis: NMSA 1978 Section 7-9-112

New Mexico has a gross receipts tax in place of a sales tax. Receipts from the sale and installation of a solar energy system may be deducted from the seller's gross receipts, so the tax is not added to a solar contract. The statute has no sunset date. The state portion of the tax has been 4.875% since 1 July 2023, with local rates on top.

Who qualifies: Systems that provide space heat, hot water or electricity to the property where they are installed, including solar panels and all equipment needed to install and operate them.

How to claim: The installer takes the deduction when reporting gross receipts. Check that your quote does not include gross receipts tax on the system and installation.

Dates and limits: The statute text read was a version marked current to 1 January 2024.

Sources: [NMSA 1978 Section 7-9-112 (FindLaw)](https://codes.findlaw.com/nm/chapter-7-taxation/nm-st-sect-7-9-112/); [New Mexico Taxation and Revenue Department, State portion of Gross Receipts Tax drops to 4.875% (27 June 2023)](https://www.tax.newmexico.gov/wp-content/uploads/2023/06/July-1-tax-changes.pdf)

### Residential property valuation rule for solar installations

- Type: Property tax exemption
- Status: Active
- Scope: statewide
- Value: Solar does not trigger an above-cap reassessment
- Administrator: County assessors
- Legal basis: NMSA 1978 Section 7-36-21.2

New Mexico limits annual increases in the taxable value of a home. Physical improvements normally allow the assessor to go above that limit, but the statute expressly excludes solar energy system installations. Adding solar therefore does not, by itself, raise the home's taxable value outside the cap. The protection ends when the property changes ownership, because a sale resets the valuation to current value.

Who qualifies: Residential property with a solar installation that provides space heat, hot water or electricity to the property.

How to claim: No application is described in the statute. Contact the county assessor if a notice of value appears to add value for the solar system.

Dates and limits: The statute text read was a version marked current to 1 January 2024.

Sources: [NMSA 1978 Section 7-36-21.2 (FindLaw)](https://codes.findlaw.com/nm/chapter-7-taxation/nm-st-sect-7-36-21-2/)

### Net metering (17.9.570 NMAC)

- Type: Net metering
- Status: Active
- Scope: statewide
- Value: kWh credits carry forward for systems up to 10 kW
- Administrator: New Mexico Public Regulation Commission
- Legal basis: 17.9.570 NMAC; PNM Rider 24 and Rate No. 12

Regulated utilities must offer net metering to customer-sited renewable systems. For systems of 10 kW or less the utility may carry net kWh forward month to month or pay for the excess at its energy rate. PNM carries kWh credits forward without expiry. Larger systems are paid monthly at the avoided-cost energy rate.

Who qualifies: Customers of utilities under Public Regulation Commission jurisdiction with an interconnected system. PNM's Small PV Program covers inverter capacity of 10 kW AC or less.

How to claim: Apply for interconnection with your utility before installation. PNM's solar department takes applications and charges an application fee.

Sources: [17.9.570 NMAC](https://www.srca.nm.gov/parts/title17/17.009.0570.html); [PNM, Solar Interconnection Benefits](https://www.pnm.com/solar-interconnection-benefits)

### New Mexico Community Solar Program

- Type: Community solar
- Status: Active
- Scope: statewide
- Value: Bill credits for a share of a project's output
- Administrator: New Mexico Public Regulation Commission; program administrator InClime
- Legal basis: Community Solar Act (2021 SB 84); 17.9.573 NMAC

Created by the Community Solar Act of 2021 (SB 84). Customers subscribe to a share of a local solar project through a community solar provider and receive bill credits in proportion to that share, with credits starting once the project is operating. Every project must fill at least 30% of its capacity with low-income subscribers. The commission's current rule, 17.9.573 NMAC, took effect on 22 October 2024, and the commission's page still describes the program as under development.

Who qualifies: Customers of participating investor-owned utilities, including renters. Low-income status means household income at or below 80% of area median income, shown by enrollment in programs such as Medicaid, SNAP or LIHEAP, or by a signed self-attestation.

How to claim: Choose a community solar provider with projects in your utility territory through the program website, csnewmexico.com, and sign a subscription agreement. Read it first: it is a binding contract with the project's subscription manager.

Dates and limits: The program site does not guarantee a level of savings. Program capacity and the number of operating projects were not confirmed.

Sources: [New Mexico Public Regulation Commission, Community Solar](https://www.prc.nm.gov/utilities/community-solar/); [New Mexico Community Solar Program, Low-Income Customers](https://www.csnewmexico.com/low-income-customers/); [New Mexico Community Solar Program, How to Participate](https://www.csnewmexico.com/how-to-participate/)

### New Mexico Solar for All

- Type: Income-qualified
- Status: Paused
- Scope: statewide
- Value: $156 million federal grant, on hold
- Administrator: EMNRD Energy Conservation and Management Division

New Mexico was awarded $156 million from the EPA's Solar for All program in April 2024 to fund solar for low-income households. On 7 August 2025 the state was notified that the EPA was attempting to terminate all Solar for All grants, and EMNRD paused the program until further notice. No application process or contractor solicitation had opened. EMNRD says it is seeking ways to reinstate the program.

Who qualifies: Was designed for low-income and disadvantaged households. Not open.

How to claim: Not available. EMNRD's Solar for All page carries updates.

Dates and limits: Federal courts set aside the EPA's termination in September 2026 in cases brought by other grantees. EMNRD's page did not report any change in status when checked. A separate, state-funded Solar for New Mexico request for applications for tribes, pueblos and Indian nations was posted on 13 May 2026.

Sources: [EMNRD, Solar for All](https://www.emnrd.nm.gov/ecmd/solar-for-all/)

### PNM Solar REC purchase program

- Type: Performance payment
- Status: Ended
- Scope: utility
- Value: Closed to new customers since 31 December 2022
- Administrator: PNM
- End date: 2022-12-31
- Legal basis: PNM Schedules 24 and 32

PNM used to pay solar customers per kWh for the renewable energy certificates their systems produced. PNM states that the Public Regulation Commission discontinued the REC incentive program on 31 December 2022. Customers with an existing REC agreement are paid according to the terms of that agreement.

Who qualifies: Existing agreement holders only.

How to claim: Not open to new systems. Existing customers can request a copy of their agreement from PNM's solar department.

Sources: [PNM, Customer Solar Program](https://www.pnm.com/solar)

### Solar Rights Act and limits on covenants

- Type: Solar rights law
- Status: Active
- Scope: statewide
- Value: Covenants that ban solar collectors are void
- Administrator: County and municipal zoning authorities; courts
- Legal basis: NMSA 1978 Sections 3-18-32 and 47-3-4

A covenant, restriction or condition in a deed or other real property instrument that effectively prohibits installing or using a solar collector is void and unenforceable, for instruments effective after 1 July 1978. Counties and municipalities may not restrict solar collectors either, except in historic districts. Separately, the Solar Rights Act declares the right to use solar energy a transferable property right.

Who qualifies: Property owners statewide. Historic districts may regulate or restrict collectors.

How to claim: No filing is needed to rely on the covenant rule. Transfers of a solar right are recorded with the county clerk.

Sources: [NMSA 1978 Section 3-18-32 (FindLaw)](https://codes.findlaw.com/nm/chapter-3-municipalities/nm-st-sect-3-18-32/); [NMSA 1978 Section 47-3-4 (FindLaw)](https://codes.findlaw.com/nm/chapter-47-property-law/nm-st-sect-47-3-4/)

## Solar rights, leases and PPAs

Section 3-18-32 voids any covenant, restriction or condition in a deed, contract or other instrument affecting real property that effectively prohibits the installation or use of a solar collector, for instruments effective after 1 July 1978. The statute does not name homeowners associations, but association covenants are restrictions of this kind. Local governments are also barred from restricting solar collectors, except in historic districts.

The Solar Rights Act (Section 47-3-4) treats the right to use solar energy as a property right. Priority in time generally gives the better right, the right can be transferred, and a transfer must be recorded. The recording procedure in the related Solar Recordation Act was not read.

Leases and PPAs: allowed. Section 62-13-13.1 says a person who owns a renewable distributed generation facility on a host customer's site and sells its output to that host is not a public utility, provided the system supplies no more than 120% of the host's average annual consumption. That permits leases and power purchase agreements. EMNRD's user guide states that a leased system or one under a power purchase agreement does not qualify for the credit. The state tax credit requires the taxpayer to purchase the system, so a leased system does not earn it for the homeowner.

## Programs that have ended

- PNM Solar REC purchase program (ended 2022-12-31): Per-kWh payments for solar renewable energy certificates. Closed to new customers; existing agreements continue on their own terms.
- Solar tax credit claims for 2020 to 2024 installations (ended 2025-12-31): EMNRD's user guide states that applications for systems installed from 2020 through 2024 had to be submitted by 31 December 2025 and are no longer accepted. The supplemental funding for 2020 to 2023 installations has also sunset.

## Recent policy changes

- 2026-05-13: EMNRD posted a request for applications from tribes, pueblos and Indian nations for state-funded Solar for New Mexico projects, separate from the paused federal program.
- 2026-03-01: PNM's revised Rate No. 12 took effect, setting the monthly avoided-cost prices used to pay systems over 10 kW and to cash out banked credits.
- 2025-12-31: Deadline passed for solar tax credit applications covering systems installed from 2020 through 2024.
- 2025-08-07: EMNRD was notified that the EPA was attempting to terminate all Solar for All grants and paused New Mexico's $156 million program.
- 2024-10-22: The Public Regulation Commission's revised community solar rule, 17.9.573 NMAC, took effect.
- 2024-01-01: The annual limit on solar tax credit certifications rose from $12 million to $30 million for 2024 and later years.

## Questions

### How much is the New Mexico solar tax credit?

It is 10% of the cost of equipment, materials and labor, up to $6,000 per system. On a $25,000 system that is $2,500. The credit is refundable, so you receive the full certified amount even if it is more than the state income tax you owe.

### Can the New Mexico solar tax credit run out?

Yes. EMNRD can certify $30 million of credits per calendar year and processes applications first come, first served. Applications received after the annual limit is reached are returned and do not carry into the next year, so apply soon after your system passes inspection. You must apply within 12 months after the calendar year of installation.

### Does the state tax credit cover batteries?

Not on their own. EMNRD's guide says standalone battery power is not an allowable cost for a grid-tied solar system, and battery storage beyond industry-standard sizing is excluded from the certified cost. No separate state battery incentive was found.

### How does PNM net metering work?

For systems of 10 kW AC or less, any month in which you produce more than you use leaves a kWh credit that carries to later bills and does not expire. You are only paid cash for credits if you close the account, at a low avoided-cost rate. Systems larger than 10 kW are paid that low rate every month, so most homes stay at or under 10 kW.

### Do I pay tax on a solar installation in New Mexico?

Generally no. Receipts from selling and installing a solar energy system are deductible from gross receipts tax, so the installer should not add that tax to your contract. Installing solar also does not allow the assessor to raise your home's taxable value above the normal annual limit.

### Can an HOA prohibit solar panels in New Mexico?

No. State law makes any covenant or deed restriction that effectively prohibits a solar collector void and unenforceable, for instruments effective after 1 July 1978. The exception is historic districts, where local government may regulate or restrict collectors.

### Is New Mexico's Solar for All program taking applications?

No. The $156 million program has been paused since August 2025, when the EPA moved to terminate the grants, and it never opened to households. EMNRD says it is looking for ways to reinstate it. Income-qualified households can look at community solar, where each project must reserve at least 30% of its capacity for low-income subscribers.

### If I lease my panels, do I get the state credit?

No. The credit goes to a taxpayer who purchases and installs a system on property they own. Leases and power purchase agreements are legal in New Mexico, but the homeowner in those arrangements does not own the system.

## Sources

1. [EMNRD, Solar Market Development Tax Credit](https://www.emnrd.nm.gov/ecmd/tax-incentives/solar-market-development-tax-credit-smdtc/)
2. [EMNRD, New Solar Market Development Tax Credit User Guide (February 2026)](https://www.emnrd.nm.gov/ecmd/wp-content/uploads/sites/3/NSMDTC-02.2026.pdf)
3. [NMSA 1978 Section 7-2-18.31, 2025 text (Justia)](https://law.justia.com/codes/new-mexico/chapter-7/article-2/section-7-2-18-31/)
4. [NMSA 1978 Section 7-9-112 (FindLaw)](https://codes.findlaw.com/nm/chapter-7-taxation/nm-st-sect-7-9-112/)
5. [New Mexico Taxation and Revenue Department, State portion of Gross Receipts Tax drops to 4.875% (27 June 2023)](https://www.tax.newmexico.gov/wp-content/uploads/2023/06/July-1-tax-changes.pdf)
6. [NMSA 1978 Section 7-36-21.2 (FindLaw)](https://codes.findlaw.com/nm/chapter-7-taxation/nm-st-sect-7-36-21-2/)
7. [17.9.570 NMAC](https://www.srca.nm.gov/parts/title17/17.009.0570.html)
8. [PNM, Solar Interconnection Benefits](https://www.pnm.com/solar-interconnection-benefits)
9. [New Mexico Public Regulation Commission, Community Solar](https://www.prc.nm.gov/utilities/community-solar/)
10. [New Mexico Community Solar Program, Low-Income Customers](https://www.csnewmexico.com/low-income-customers/)
11. [New Mexico Community Solar Program, How to Participate](https://www.csnewmexico.com/how-to-participate/)
12. [EMNRD, Solar for All](https://www.emnrd.nm.gov/ecmd/solar-for-all/)
13. [PNM, Customer Solar Program](https://www.pnm.com/solar)
14. [NMSA 1978 Section 3-18-32 (FindLaw)](https://codes.findlaw.com/nm/chapter-3-municipalities/nm-st-sect-3-18-32/)
15. [NMSA 1978 Section 47-3-4 (FindLaw)](https://codes.findlaw.com/nm/chapter-47-property-law/nm-st-sect-47-3-4/)
16. [PNM Rate No. 12, effective 1 March 2026](https://www.pnm.com/documents/d/pnm.com/pnm-an-649-effective-march-1-2026-1)
17. [EMNRD, New Solar Market Development Tax Credit FAQ](https://www.emnrd.nm.gov/ecmd/faq1)

License: CC BY 4.0. Cite as "Solar Incentive Atlas".
